Ok I am having my 90gl tank drilled next week and need your help. I have the Magdrive 9.5 for the return witch is a 3/4" so the hole for that will be 1-1/2".
I have that placed on the Left of the pictures and from the top of the hole to the very top of the tank is 3". The return I have 5-1/2" from the side of the tank.
The Overflow is going to be a 1-1/2" bulkhead and the hole for that will be 2-3/8" (OMG looks huge lol). I have that positioned 1 foot from the side and 6" form the very top of the aquarium.
Is this a good plan? (The holes are the white circles that I cut out and tapped on)
http://onfinite.com/libraries/1006798/5c7.jpg
This is my plan for the Overflow:
http://onfinite.com/libraries/975703/bab.jpg
I am just scared to not get the holes in the best places. Obviously having the holes cut is a one-time thing.
I have that placed on the Left of the pictures and from the top of the hole to the very top of the tank is 3". The return I have 5-1/2" from the side of the tank.
The Overflow is going to be a 1-1/2" bulkhead and the hole for that will be 2-3/8" (OMG looks huge lol). I have that positioned 1 foot from the side and 6" form the very top of the aquarium.
Is this a good plan? (The holes are the white circles that I cut out and tapped on)
http://onfinite.com/libraries/1006798/5c7.jpg
This is my plan for the Overflow:
http://onfinite.com/libraries/975703/bab.jpg
I am just scared to not get the holes in the best places. Obviously having the holes cut is a one-time thing.