Got the extra wiring done tonight.
I first spliced in a length of 18 awg stranded wire to the red and blue wires with crimp-on butt connectors.
I added about 8 inches to the wire. Next I added on some crimp on disconnect terminals to all six wires.
This makes working with the canopy considerably easier. I wanted to grab quick disconnects, but I didn't find any. These disconnect, but it takes some effort to get them apart.
Here's the after shot showing the new wire length and the disconnects.
Look much nicer, and I don't have the stress on the cables anymore. All in all, for $25 of materials and maybe an hour and a half of labour, it was well worth it.
On the downside, the slate tile structure is a write-off. The slate snaps when I try to pick it up, and it's just not what I was looking for. I'll try to go with just the caves that the driftwood will provide, and I'll add on if the cichlids seem to be getting aggressive.
I was hoping to get more done today, but I spent the rest of the night assembling a parrot cage. My wife is getting a brown-headed parrot for her birthday and it should be arriving later this week, and she's pretty thrilled. The new animal count in our house is three aquariums, two rabbits and a parrot :headbang2: