Dual Tank System Build Thread

Wow, that looks crazy awesome already! I am stoked to see how its all going to turn out! Keep up the great work and Goodluck man.
 
Totally amazing idea!!!
 
Wow looks great. What type of router bit did you use, and is it just regular acrylic adhesive that you used? The runny kind that basically melts it together?

Thanks, and again it looks very nice. I know how much NOT fun sanding that stuff is.

For which part? For the top I used a 1/2" bottom collar bit with a wooden form for the shape. For the overflow slot's I used the same bit, with a 3/4" form (I didn't want to use a plunge base, and you can't start a router with a 3/4" bit in a 3/4" in hole, so I used a smaller bit).

Yes I used Weld-on #3 and #16. Did an OK job at that, messed up the bottom of the overflow a bit and been dealing with some minor leak repairs, nothing serious though.


Thank's for the encouragement. It's been a lot of fun, long way to go!
 
Small update.

90% done with tank 2. Just have to attach the overflow and water test. Will probably attach it tonight and water test tomorrow.

After that, it's onto modifying the room, and cabinet construction.
 
So sorry for the lack of updates for anyone actually reading this.

Had a small hiccup in my plans, my first kid was born 3 weeks early. As you can imagine, it's been a hectic few weeks since.

Anyway, not for lack of progress we made all the structural modifications to the room. Still have some finish work to do on the drywall, but shortly I will be ready to actually begin work on the stands/cabinetry.

I'll post some pictures as soon as I can.
 
Had a small hiccup in my plans, my first kid was born 3 weeks early.

:bday: Congrats!! :hearts:

Now by my calculations you have about a year to finish the tanks. After that you won't have free time for another 20 years or so.
 
Alright, finally got around to getting some updates here. Sorry for the delay. I've been working on it, just haven't been posting.

Removing the old archway:

archteardown1.jpg


More teardown:
http://www.chadandnicole.com/LinkedPictures/fishtank/archteardown2.jpg
archteardown2.jpg


Framing out the new (square and lower) archway:
archrebuild1.jpg


Drywall on the new arch:
archrebuild2.jpg


We have since plastered, but are waiting to have a professional come out and texture.

Also started on the stands today:
stand1.jpg


Almost done (need a few brackets, then its ready):
stand2.jpg


That's it for now. Once the stands are ready to go, I'll tear out the carpet. Probably do the plumbing after that (through the walls and into cabinets) before I build the lower cabinets out. Still have the upper cabinets to work out, and the garage equipment cabinet.
 
Wow:)

This looks so good! When do you think you'll have it finished?
 
AquariaCentral.com