Today I got around to cementing and putting on the first layer of Drylok!
First Lay of Cement
Second Layer of Cement was added once the first layer had dried for a few hours. The layers are rather thin (by design), and appeared dry within about 30 minutes to an hour and after 3 felt hard rather than chalky so I felt confident adding on the second layer. After letting that dry a further few hours I added Drylok with some charcoal cement pigment.
I'm going for a smooth bedrock/large Boulder look and I'm loving how it's coming out!! Gotta wait for this to dry a bit before I can coat again. After ample cure time then it will be time for install!!
First Lay of Cement
Second Layer of Cement was added once the first layer had dried for a few hours. The layers are rather thin (by design), and appeared dry within about 30 minutes to an hour and after 3 felt hard rather than chalky so I felt confident adding on the second layer. After letting that dry a further few hours I added Drylok with some charcoal cement pigment.
I'm going for a smooth bedrock/large Boulder look and I'm loving how it's coming out!! Gotta wait for this to dry a bit before I can coat again. After ample cure time then it will be time for install!!