has anyone ever considered trying to create something that would create a perpetual waterchange . like a dripline that goes into a sump like tank that dechlorinates it then pumps it into the tank.
then another pump that pushes old water into a drain or a storage tank
well preferbaly the tank would pump into the drain first then new water pumped in
i was thinking of maybe doing something like this. i used to be a master landscaper and i think a sprinkler timer would work as the master computer for the whole operation.
it would take precise timing and tuneups 2 times a year but i think it might be a workable idea.
i know i dont have the money for it right now but hey if i ever win the lottery and have a tnk big enuff that it would be worth doing ill tell you how it works out.
ALSO before i get attacked i know gravel vacking is very important. but just think of your water quality if you had a rig like this.
later i may make a diagram and show you what im talkign about
then another pump that pushes old water into a drain or a storage tank
well preferbaly the tank would pump into the drain first then new water pumped in
i was thinking of maybe doing something like this. i used to be a master landscaper and i think a sprinkler timer would work as the master computer for the whole operation.
it would take precise timing and tuneups 2 times a year but i think it might be a workable idea.
i know i dont have the money for it right now but hey if i ever win the lottery and have a tnk big enuff that it would be worth doing ill tell you how it works out.
ALSO before i get attacked i know gravel vacking is very important. but just think of your water quality if you had a rig like this.
later i may make a diagram and show you what im talkign about