Don't have any experience with inline heaters.
3 filters... 3 items (heater, bioreactor, UV sterilizer) to install inline after the filter on the output side :headbang2:I'd install one on each filter.
This will minimize any flow reduction and make for the most robust setup.
3 filters... 3 items (heater, bioreactor, UV sterilizer) to install inline after the filter on the output side :headbang2:I'd install one on each filter.
This will minimize any flow reduction and make for the most robust setup.