Will be a long wait, 2 weeks for the big move.
but need to do lots of small things first.
- paint the dome
- test the bottom-drain
- fix the dome on top
- prepare for sun-shade
- get pump running
- move water-tap
- get air-pump and connect it
- fit jump-protection at the front and sides
Thats all for next 2 weeks.
then finally make the last push for digging and moving Mr.T.
Will be quite a project, but confident we can finish that in one day.
Moving will be a matter of lifting his whole liner on top of the new one I hope and then slowly let it go and have him get used to the light and space.
but need to do lots of small things first.
- paint the dome
- test the bottom-drain
- fix the dome on top
- prepare for sun-shade
- get pump running
- move water-tap
- get air-pump and connect it
- fit jump-protection at the front and sides
Thats all for next 2 weeks.
then finally make the last push for digging and moving Mr.T.
Will be quite a project, but confident we can finish that in one day.
Moving will be a matter of lifting his whole liner on top of the new one I hope and then slowly let it go and have him get used to the light and space.