I've realized to do the 2" of black flourite I'd have to get rid of the majority of my gravel or I'll have 5-6" worth of substrate.
To do a 37G it would be at least 100$ (including shipping) to do a 90G over 200$. I don't have the money for that now, but when I do, I'll probably go ahead and do it.
To do a 37G it would be at least 100$ (including shipping) to do a 90G over 200$. I don't have the money for that now, but when I do, I'll probably go ahead and do it.