Is it ok to place the reactor before the inline heater?
Given the VERY limited space I am working with and the way it must be plumbed, I hope the answer is yes.
It would also flow through the UV sterilizer, however the sterilizer is off during CO2 hours.
Given the VERY limited space I am working with and the way it must be plumbed, I hope the answer is yes.
It would also flow through the UV sterilizer, however the sterilizer is off during CO2 hours.