UPDATE 3-17-2010
Stands are finished and painted. I used the same gloss black paint for the stands that I did for the walls..... I'd post pics, but the black on black paint scheme makes the racks fade away. In the right light, you'd think they weren't even there. In the next couple days.I hope to put a second coat on the rack faces to make them look even nicer. I'm not the neatest painter in the world, so I'll need to put another coat of paint on the floor sometime soon.
Next project will be to bring in the work station and hook up the sink/drain..... Then bring the tanks in and clean them...... Then paint the backs & sides of the tanks..... Then install the bulkheads in all the tanks..... Then plumb them all to the drain system.... Then install the continuous drip water change system.... Then install the air plumbing loop and valves.... I'm sure I left out about 10 things to do !!!!!!!!