This new thread deals with the actual assembly.
The first thing I knew I had to do was prepare the impeller cover for a mating surface that would somehow hook up to the giant micron filter and the little grates that are their to keep that from happening had to go. To I cut and ground them off with mt Dremel tool.
The most difficult part was finding a way to connect the giant micron cart directly to the impeller housing so that bypass would not occur the way it does in the stack basket assembly becasue of gaps and relief slots. A powerful glue was needed to attach the 3/4" male PVC fitting below. The PVC primer & glue made for a bond that even surprised me permanently bonding the fitting to the impeller cover as one piece. This OK because the impeller cover detaches and a spare can for use separately as part of the micron filter setup.
The corrugated hose and attached cart is an early peek, ignore for now.
Any questions on clarification so far please post them, otherwise Ill proceed on to the next step in a couple of hours.
The first thing I knew I had to do was prepare the impeller cover for a mating surface that would somehow hook up to the giant micron filter and the little grates that are their to keep that from happening had to go. To I cut and ground them off with mt Dremel tool.



The corrugated hose and attached cart is an early peek, ignore for now.

Any questions on clarification so far please post them, otherwise Ill proceed on to the next step in a couple of hours.
Last edited: