The 1st coat is finished. Everything with the cement work has gone relatively well. The cement dries so slowly that I can work at a snails pace. I sprayed it with water every few hours to keep it from cracking. It’s cured for 24 hours now.
I think I used a good cement/sand mix, which again I used 2 cups cement,1 cup sand, 1 cup water, 1 Tbls cement color. The cave seems real strong and sturdy; as the bare foam cave was quite weak.
I still have one problem though; the cave still floats in the water. I put a 5 # weight on it and it floated a little, put a 10# weight on it and it sunk. Also, after doing a little research on density/buoyancy of cement and foam, I calculated that I’ll need about 13#’s of cement to sink the cave. So far, the cave weights 7.8 #’s.
Attached is what the outside looks like after the 1st coat.
I think I used a good cement/sand mix, which again I used 2 cups cement,1 cup sand, 1 cup water, 1 Tbls cement color. The cave seems real strong and sturdy; as the bare foam cave was quite weak.
I still have one problem though; the cave still floats in the water. I put a 5 # weight on it and it floated a little, put a 10# weight on it and it sunk. Also, after doing a little research on density/buoyancy of cement and foam, I calculated that I’ll need about 13#’s of cement to sink the cave. So far, the cave weights 7.8 #’s.
Attached is what the outside looks like after the 1st coat.