Finished?
I am pleased to announce my 230 gal peninsula DT and all associated plumbing (125 gal sump in basement), carpentry, and finish work is complete.
From the ground breaking framing of the pump room in the basement to yesterday's the final coat of polyurethane, approximately 18 months have elapsed.
This project was 100% DIY, as in no tradesman were used. I did it all, often more than once, and with the help of my father on occasion, e.g. third attempt at securing bulkheads.
Amazing how much water can come from such a seemingly small leak.
Ironically, I think I already have to make an alteration by adding an exhaust fan to underneath the stand.
I have included some pics. I apologize for the glare. I will try to snap some better pics after sunset when I have more control over ambient lighting.
Regards, Keith
