And the last piece of the puzzle, assembled together before it goes into the ground.
Quite lucky the flange I used for the Bottom-drain also fits exactly inside the bottom-opening.
So just a matter of giving the Flange a collar, (getting fast with it, only took 20 minutes), and then epoxy inside the rim. Next the flange pushed in and 4 aluminium brackets that came out back over it to push it down and to keep it in place.
Job done, tank ready.
Now busy with the drains and after that, it's a matter of lowering it into the ground on top of the elbow that's cemented it there.
Quite lucky the flange I used for the Bottom-drain also fits exactly inside the bottom-opening.
So just a matter of giving the Flange a collar, (getting fast with it, only took 20 minutes), and then epoxy inside the rim. Next the flange pushed in and 4 aluminium brackets that came out back over it to push it down and to keep it in place.
Job done, tank ready.
Now busy with the drains and after that, it's a matter of lowering it into the ground on top of the elbow that's cemented it there.