Will do guys, I'll get some up this weekend while I do my plumbing. I'm going to attempt to plumb the majority of the system (minus the closed loop, I haven't bought the oceans motions devices yet).
On my list to get the system running:
- Plumb
- Have an electrician install a new 20amp circuit and outlets near the equipment cabinet.
- Buy the flow redirector (oceans motions), debating if the squirt is big enough for my needs
- See if a pump I have will work for the CL, or if I need to buy a quieter pump.
- Build a faux rock wall using rock rubble and expansion foam
- Put my turf scrubbing setup together (doing something similar to what you did Ace, to save costs)
- Cycle