Thanks guys. Sorry there hasn't been an update in a couple of days. I took some pics today of the progress. Will try to get them up tonight or in the morning.
Well after ripping out some floor and replacing it, the construction on walls continues. This wall has a 28" ledge for our tv, stereo, dvd player, etc. The bottom space will be accessible from the bathroom for storage of blankets, sleeping bags, etc. We had our first minor/major injury. My husband's cousin shot himself in the thumb with the nail gun. The pic of the injury is the last so if you don't like a bit of blood, don't scroll all of the way down.
We are a day or two behind where we wanted to be, but next weekend still looks like when the first of the tanks will be moved. The first tank to be installed will be the frontosa tank, then the discus. The other tank on the opposite side of the room will wait until the following weekend.
All of the drywall is up and taped finally! My daughter was concerned about her uncle Carl (the brain surgeon who shot himself with a nail) being too hot, so she had to hold cold compresses on his forehead while he worked. It won't be long now.